Digging out a high-precision GPS reciever being used to calibrate the Scott Base tide gauge.
Removing survey drum beacon from Mt Boreas.
Inspecting an iceberg off Cape Roberts.
Album: K150 08/09
Ice wall that was constructed in front of the flagpole for the Erebus 30th anniversary commemoration
Looking over McMurdo Station to Observation Hill; wind turbines also in view
Undertaking survey measurements for a horizon profile from the roof of the Arrival Heights Laboratory
Watching the C17 taxi after landing.
Looking for a route to cross the tide crack at First View Point (Cape Roberts/Granite Harbour).
At First View Point (Cape Roberts/Granite Harbour)
Beside tide crack at Cape Roberts - Mt Erebus in the background.
Securing high-precision GPS equipment for tide gauge calibration at Cape Roberts.
Repairing the LINZ Tide Gauge at Cape Roberts.
Undertaking monitoring survey of Terra Nova Hut at Cape Evans
Inside ice cave at tip of Erebus Ice Tongue
Album: K150 09/10
Removing survey drum beacon from Mt Boreas